Close Menu
Energy NewsEnergy News
  • NEWS
    • Breaking News
    • Hydrogen
    • Energy Storage
    • Grid
    • SMR
    • Projects
    • Production
    • Transport
    • Research
  • SPOTLIGHT
    • Interviews
    • Face 2 Face
    • Podcast
    • Webinars
    • Analysis
    • Columnists
    • Reviews
    • Events
  • REGIONAL
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle east
    • Pacific
  • COMMUNITY
  • ABOUT
    • Advisory Board
    • Contact us
    • Report Your News
    • Advertize
    • Subscribe
LinkedIn X (Twitter) YouTube Facebook
Trending
  • TWO DAY MASTERCLASS ON: EXPLOITATION & COMMERCIALIZATION POTENTIAL OF NATURAL HYDROGEN
  • Fossil Fuel Giants Intensify Legal Battles Against Climate Policies Through ISDS System
  • Fortescue Reports Lowest Profit in Six Years, Adjusts Green Hydrogen Timelines Amid Market Pressures
  • Exide Strengthens European Footprint with High-Capacity BESS
  • UK Consortium Launches £500M Battery Storage Platform to Boost Grid Flexibility
  • Oman Positions Waste-to-Hydrogen as Cornerstone of Circular Economy Transition
  • Wärtsilä to Equip Wasaline’s Aurora Botnia with World’s Largest Marine Battery Hybrid System
  • India’s $92 Billion Bet on Green Hydrogen: Can Policy and Technology Deliver?
LinkedIn X (Twitter) YouTube Facebook
Energy NewsEnergy News
  • NEWS
    • Breaking News
    • Hydrogen
    • Energy Storage
    • Grid
    • SMR
    • Projects
    • Production
    • Transport
    • Research
  • SPOTLIGHT
    • Interviews
    • Face 2 Face
    • Podcast
    • Webinars
    • Analysis
    • Columnists
    • Reviews
    • Events
  • REGIONAL
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle east
    • Pacific
  • COMMUNITY
  • ABOUT
    • Advisory Board
    • Contact us
    • Report Your News
    • Advertize
    • Subscribe
Energy NewsEnergy News
Home Home - Europe
Green Hydrogen H2 News

First subsea hardware in place for Minesto’s Faroe Islands tidal energy project

Anela DoksoBy Anela Dokso08/06/20202 Mins Read
Share
LinkedIn Twitter Facebook Email WhatsApp Telegram

Minesto has completed the first offshore installation phase of the Faroe Islands tidal energy project, as the gravity-based foundation for the power plant has been installed at the site in Vestmannasund.

In 2018, Minesto signed an agreement with SEV to install two DG100 units in Vestmannasund. The agreement also included a power purchase agreement through which SEV committed to purchase the electricity generated by the tidal energy converters.

The novel gravity-based foundation, designed and fabricated by Leask Marine in Orkney, consists of a base frame and a number of doughnut-shaped ballast weights. Each component has been individually lowered to the seabed using the Leask multicat vessel C-Fenna.

“We are very pleased to have the first subsea hardware in place. The operations team has managed to safely progress the offshore installation campaign, adapting the plan to overcome both unfavourable weather conditions and logistical challenges related to the ongoing pandemic.”

David Collier, COO at Minesto.

The foundation will provide the connection point for Minesto’s DG100 tidal kite system. When installed to the foundation, the bottom joint of the kite system provides a pivoting connection point for the tether, allowing the kite to operate freely in its automatically controlled figure-of-eight trajectory. This enables the system to generate predictable renewable tidal electricity.

“The gravity-based structure developed for the Vestmannasund project has a new cost-effective modular design, which among other things means that we can use smaller vessels for transportation and installation.”

The next installation phase involves the subsea export cable that distributes electricity generated by the power plant to the electric grid operated by Minesto’s partner SEV.

Share. LinkedIn Twitter Facebook Email

Related Posts

NATURAL HYDROGEN

TWO DAY MASTERCLASS ON: EXPLOITATION & COMMERCIALIZATION POTENTIAL OF NATURAL HYDROGEN

28/08/2025
Fossil Fuel

Fossil Fuel Giants Intensify Legal Battles Against Climate Policies Through ISDS System

28/08/2025
Fortescue Reports Lowest Profit in Six Years, Adjusts Green Hydrogen Timelines Amid Market Pressures

Fortescue Reports Lowest Profit in Six Years, Adjusts Green Hydrogen Timelines Amid Market Pressures

28/08/2025
Exide Strengthens European Footprint with High-Capacity BESS

Exide Strengthens European Footprint with High-Capacity BESS

28/08/2025
Batteries Lithium

UK Consortium Launches £500M Battery Storage Platform to Boost Grid Flexibility

28/08/2025
Oman

Oman Positions Waste-to-Hydrogen as Cornerstone of Circular Economy Transition

28/08/2025
NATURAL HYDROGEN

TWO DAY MASTERCLASS ON: EXPLOITATION & COMMERCIALIZATION POTENTIAL OF NATURAL HYDROGEN

28/08/2025
Fossil Fuel

Fossil Fuel Giants Intensify Legal Battles Against Climate Policies Through ISDS System

28/08/2025
Fortescue Reports Lowest Profit in Six Years, Adjusts Green Hydrogen Timelines Amid Market Pressures

Fortescue Reports Lowest Profit in Six Years, Adjusts Green Hydrogen Timelines Amid Market Pressures

28/08/2025
Exide Strengthens European Footprint with High-Capacity BESS

Exide Strengthens European Footprint with High-Capacity BESS

28/08/2025

Subscribe to Updates

Get the latest news from the hydrogen market subscribe to our newsletter.

LinkedIn X (Twitter) Facebook YouTube

News

  • Inteviews
  • Webinars
  • Hydrogen
  • Spotlight
  • Regional

Company

  • Advertising
  • Media Kits
  • Contact Info
  • GDPR Policy

Subscriptions

  • Subscribe
  • Newsletters
  • Sponsored News

Subscribe to Updates

Get the latest news from EnergyNewsBiz about hydrogen.

© 2025 EnergyNews.biz
  • Privacy Policy
  • Terms
  • Accessibility

Type above and press Enter to search. Press Esc to cancel.