The Public Gas Corporation of Greece (DEPA) has issued a tender titled “Construction Work for Gas Pipelines – EPC Activities for CS1/MS1 Compressor and Metering Station of EastMed Pipeline Project.” The tender was published on July 31, 2024, and the submission deadline is September 9, 2024.

The main objective of the tender is to secure a competent contractor to execute engineering, procurement, and construction (EPC) activities specifically for the CS1/MS1 Compressor Station and Metering Station. These stations are crucial as they regulate and monitor gas flow through the pipeline, ensuring efficient and safe transportation.

Significantly, the tender stipulates that the selected contractor must design and construct these facilities to accommodate future hydrogen blending. This includes using materials and technologies capable of handling hydrogen’s unique properties, such as its smaller molecules and higher diffusivity than natural gas.

The technical specifications include the following:

– The compressor station must be designed to operate under high-pressure conditions essential for efficient gas transportation.
– The metering station includes advanced measurement technologies to accurately monitor gas flow and ensure compliance with domestic and international standards.
– The infrastructure must be adaptable for future conversion to hydrogen transportation, necessitating hydrogen-compatible materials.

Investing in future-proofed hydrogen infrastructure is significant for Greece and the broader region. It supports the transition to cleaner energy sources and helps mitigate the environmental impact of traditional fossil fuels. This tender represents a strategic move to position Greece as a key player in the evolving hydrogen economy, with long-term benefits for energy security and sustainability in the region.

Share.
Exit mobile version