Close Menu
Energy NewsEnergy News
  • NEWS
    • Breaking News
    • Hydrogen
    • Energy Storage
    • Grid
    • SMR
    • Projects
    • Production
    • Transport
    • Research
  • SPOTLIGHT
    • Interviews
    • Face 2 Face
    • Podcast
    • Webinars
    • Analysis
    • Columnists
    • Reviews
    • Events
  • REGIONAL
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle east
    • Pacific
  • COMMUNITY
  • ABOUT
    • Advisory Board
    • Contact us
    • Report Your News
    • Advertize
    • Subscribe
LinkedIn X (Twitter) YouTube Facebook
Trending
  • TWO DAY MASTERCLASS ON: EXPLOITATION & COMMERCIALIZATION POTENTIAL OF NATURAL HYDROGEN
  • Fossil Fuel Giants Intensify Legal Battles Against Climate Policies Through ISDS System
  • Fortescue Reports Lowest Profit in Six Years, Adjusts Green Hydrogen Timelines Amid Market Pressures
  • Exide Strengthens European Footprint with High-Capacity BESS
  • UK Consortium Launches £500M Battery Storage Platform to Boost Grid Flexibility
  • Oman Positions Waste-to-Hydrogen as Cornerstone of Circular Economy Transition
  • Wärtsilä to Equip Wasaline’s Aurora Botnia with World’s Largest Marine Battery Hybrid System
  • India’s $92 Billion Bet on Green Hydrogen: Can Policy and Technology Deliver?
LinkedIn X (Twitter) YouTube Facebook
Energy NewsEnergy News
  • NEWS
    • Breaking News
    • Hydrogen
    • Energy Storage
    • Grid
    • SMR
    • Projects
    • Production
    • Transport
    • Research
  • SPOTLIGHT
    • Interviews
    • Face 2 Face
    • Podcast
    • Webinars
    • Analysis
    • Columnists
    • Reviews
    • Events
  • REGIONAL
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle east
    • Pacific
  • COMMUNITY
  • ABOUT
    • Advisory Board
    • Contact us
    • Report Your News
    • Advertize
    • Subscribe
Energy NewsEnergy News
Home Home - Europe
Green Hydrogen H2 News

Neart na Gaoithe gets green light for Eyemouth O&M building

Anela DoksoBy Anela Dokso08/09/20202 Mins Read
Share
LinkedIn Twitter Facebook Email WhatsApp Telegram

Scottish Borders Council’s (SBC) planning committee has approved plans jointly submitted by Neart na Gaoithe (NnG) Offshore Wind Limited and Eyemouth Harbour Trust for an Operations and Maintenance (O&M) building for the offshore wind farm in Eyemouth.

The planning permission is for a new, three storey, 1,040 square metre main building and a two storey, 538 square metre storage warehouse.

The O&M building, designed by Corstorphine + Wright Architects, will house the office, warehousing and staff welfare facilities required to support the servicing of NnG, jointly owned by EDF Renewables and ESB, once the wind farm is operational.

The investment in Eyemouth will bring an economic boost to the area providing up to 50 permanent jobs over the 25-year lifespan of the project.

NnG will supply enough low carbon electricity for around 375,000 homes and has a capacity of c. 450 megawatts (MW) of low carbon energy and will offset over 400,000 tonnes of Co2 emissions each year.

“Having worked so closely with the Eyemouth Harbour Trust on the details of this proposal I am very pleased that Scottish Borders Council has approved the plans for our O&M base at Eyemouth Harbour.

“We need an O&M base for the 25-year lifespan of NnG which brings with it fantastic socio-economic benefits for the town of Eyemouth and the local community. Today’s announcement is a significant next step towards NnG’s O&M facility being based in the town.”

Matthias Haag, NnG project director.

“Today’s decision by SBC is warmly welcomed by Eyemouth Harbour Trust. We have been working closely with the NnG project team to achieve this goal.  It’s another positive and significant step towards regeneration opportunities being realised in Eyemouth.”

Christine Bell, Eyemouth Harbour Trust business manager.

Onshore construction continues for NnG at various locations along the cable route which runs underground from Thorntonloch beach and up into the Lammermuir Hills. Offshore work started in August with seabed preparations carried out in advance of the pile casings being installed.

Share. LinkedIn Twitter Facebook Email

Related Posts

NATURAL HYDROGEN

TWO DAY MASTERCLASS ON: EXPLOITATION & COMMERCIALIZATION POTENTIAL OF NATURAL HYDROGEN

28/08/2025
Fossil Fuel

Fossil Fuel Giants Intensify Legal Battles Against Climate Policies Through ISDS System

28/08/2025
Fortescue Reports Lowest Profit in Six Years, Adjusts Green Hydrogen Timelines Amid Market Pressures

Fortescue Reports Lowest Profit in Six Years, Adjusts Green Hydrogen Timelines Amid Market Pressures

28/08/2025
Exide Strengthens European Footprint with High-Capacity BESS

Exide Strengthens European Footprint with High-Capacity BESS

28/08/2025
Batteries Lithium

UK Consortium Launches £500M Battery Storage Platform to Boost Grid Flexibility

28/08/2025
Oman

Oman Positions Waste-to-Hydrogen as Cornerstone of Circular Economy Transition

28/08/2025
NATURAL HYDROGEN

TWO DAY MASTERCLASS ON: EXPLOITATION & COMMERCIALIZATION POTENTIAL OF NATURAL HYDROGEN

28/08/2025
Fossil Fuel

Fossil Fuel Giants Intensify Legal Battles Against Climate Policies Through ISDS System

28/08/2025
Fortescue Reports Lowest Profit in Six Years, Adjusts Green Hydrogen Timelines Amid Market Pressures

Fortescue Reports Lowest Profit in Six Years, Adjusts Green Hydrogen Timelines Amid Market Pressures

28/08/2025
Exide Strengthens European Footprint with High-Capacity BESS

Exide Strengthens European Footprint with High-Capacity BESS

28/08/2025

Subscribe to Updates

Get the latest news from the hydrogen market subscribe to our newsletter.

LinkedIn X (Twitter) Facebook YouTube

News

  • Inteviews
  • Webinars
  • Hydrogen
  • Spotlight
  • Regional

Company

  • Advertising
  • Media Kits
  • Contact Info
  • GDPR Policy

Subscriptions

  • Subscribe
  • Newsletters
  • Sponsored News

Subscribe to Updates

Get the latest news from EnergyNewsBiz about hydrogen.

© 2025 EnergyNews.biz
  • Privacy Policy
  • Terms
  • Accessibility

Type above and press Enter to search. Press Esc to cancel.