Close Menu
Energy NewsEnergy News
  • NEWS
    • Breaking News
    • Hydrogen
    • Energy Storage
    • Grid
    • SMR
    • Projects
    • Production
    • Transport
    • Research
  • SPOTLIGHT
    • Interviews
    • Face 2 Face
    • Podcast
    • Webinars
    • Analysis
    • Columnists
    • Reviews
    • Events
  • REGIONAL
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle east
    • Pacific
  • COMMUNITY
  • ABOUT
    • Advisory Board
    • Contact us
    • Report Your News
    • Advertize
    • Subscribe
LinkedIn X (Twitter) YouTube Facebook
Trending
  • Thyssenkrupp Nucera Advances 600-MW Green Hydrogen Project
  • Ineratec Launches Europe’s Largest Green Hydrogen E-Fuels Plant, Era One
  • TotalEnergies Acquires Solar and Battery Storage Pipeline from Low Carbon
  • NuScale’s NRC Approval Sets Stage for America’s Next Generation SMR Power Solutions
  • Yunnan’s Baochi Energy Storage Station Pioneers Grid-Forming Sodium-Ion Battery System
  • Why Physics Dooms the “Green Hydrogen” Fuel Dream
  • NEOM Green Hydrogen Project 80% Completed
  • Green Hydrogen – Pillar of European Industrial Policy but Not Without Challenges
LinkedIn X (Twitter) YouTube Facebook
Energy NewsEnergy News
  • NEWS
    • Breaking News
    • Hydrogen
    • Energy Storage
    • Grid
    • SMR
    • Projects
    • Production
    • Transport
    • Research
  • SPOTLIGHT
    • Interviews
    • Face 2 Face
    • Podcast
    • Webinars
    • Analysis
    • Columnists
    • Reviews
    • Events
  • REGIONAL
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle east
    • Pacific
  • COMMUNITY
  • ABOUT
    • Advisory Board
    • Contact us
    • Report Your News
    • Advertize
    • Subscribe
Energy NewsEnergy News
Home Home - Europe
Hystar Partners with thyssenkrupp for Automated Electrolyser Production

Hystar Partners with thyssenkrupp for Automated Electrolyser Production

Anela DoksoBy Anela Dokso22/08/20242 Mins Read
Share
LinkedIn Twitter Facebook Email WhatsApp Telegram

Hystar has awarded the Front-End Engineering Design (FEED) contract to thyssenkrupp Automation Engineering for its upcoming automated electrolyser manufacturing line in Høvik, Norway.

This move is a critical step in Hystar’s plan to expand its production capacity, aiming to increase efficiency and scale operations from the current 100 MW to a gigawatt-scale facility.

One of the key features of Hystar’s planned factory is its compact footprint, requiring only 2,500 m² to accommodate stack assembly, quality control, and testing. While this space-saving design is presented as an innovation, the real impact on production efficiency and scalability remains to be seen. In an industry where space and infrastructure are often abundant, the emphasis on a small footprint raises questions about whether this design choice is driven by necessity rather than strategic advantage.

Hystar’s reliance on an existing, high-volume supply chain to quickly scale up production is both a strength and a potential vulnerability. While tapping into established suppliers can expedite production, it also means Hystar’s growth is dependent on external factors beyond its control. In a rapidly evolving market like green hydrogen, where supply chain disruptions can have significant impacts, this strategy may need to be reevaluated to ensure long-term resilience.

Hystar’s CEO, Fredrik Mowill, highlighted the significance of the automated factory in enhancing the company’s ability to deliver large-scale green hydrogen projects. However, the success of this venture will depend not just on the factory’s construction but on how effectively Hystar can leverage this new capacity to compete in a crowded and competitive market. The partnership with thyssenkrupp is a promising start, but whether it will be enough to elevate Hystar into a leading role in the hydrogen industry remains uncertain.

Share. LinkedIn Twitter Facebook Email

Related Posts

Thyssenkrupp

Thyssenkrupp Nucera Advances 600-MW Green Hydrogen Project

04/06/2025
Hydrogen

Ineratec Launches Europe’s Largest Green Hydrogen E-Fuels Plant, Era One

04/06/2025
TotalEnergies Acquires Solar and Battery Storage Pipeline from Low Carbon

TotalEnergies Acquires Solar and Battery Storage Pipeline from Low Carbon

04/06/2025
Green Hydrogen - Pillar of European Industrial Policy but Not Without Challenges

Green Hydrogen – Pillar of European Industrial Policy but Not Without Challenges

03/06/2025
Rolls-Royce's Advanced Battery Storage System Fuels The Netherlands' Grid Stability

Rolls-Royce’s Advanced Battery Storage System Fuels The Netherlands’ Grid Stability

03/06/2025
HyTANKa Brings Mobile Hydrogen Refueling to Construction Sites

HyTANKa Brings Mobile Hydrogen Refueling to Construction Sites

02/06/2025
Thyssenkrupp

Thyssenkrupp Nucera Advances 600-MW Green Hydrogen Project

04/06/2025
Hydrogen

Ineratec Launches Europe’s Largest Green Hydrogen E-Fuels Plant, Era One

04/06/2025
TotalEnergies Acquires Solar and Battery Storage Pipeline from Low Carbon

TotalEnergies Acquires Solar and Battery Storage Pipeline from Low Carbon

04/06/2025
NuScale's NRC Approval Sets Stage for America's Next Generation SMR Power Solutions

NuScale’s NRC Approval Sets Stage for America’s Next Generation SMR Power Solutions

04/06/2025

Subscribe to Updates

Get the latest news from the hydrogen market subscribe to our newsletter.

LinkedIn X (Twitter) Facebook YouTube

News

  • Inteviews
  • Webinars
  • Hydrogen
  • Spotlight
  • Regional

Company

  • Advertising
  • Media Kits
  • Contact Info
  • GDPR Policy

Subscriptions

  • Subscribe
  • Newsletters
  • Sponsored News

Subscribe to Updates

Get the latest news from EnergyNewsBiz about hydrogen.

© 2025 EnergyNews.biz
  • Privacy Policy
  • Terms
  • Accessibility

Type above and press Enter to search. Press Esc to cancel.