Close Menu
Energy NewsEnergy News
  • NEWS
    • Breaking News
    • Hydrogen
    • Energy Storage
    • Grid
    • SMR
    • Projects
    • Production
    • Transport
    • Research
  • SPOTLIGHT
    • Interviews
    • Face 2 Face
    • Podcast
    • Webinars
    • Analysis
    • Columnists
    • Reviews
    • Events
  • REGIONAL
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle east
    • Pacific
  • COMMUNITY
  • ABOUT
    • Advisory Board
    • Contact us
    • Report Your News
    • Advertize
    • Subscribe
LinkedIn X (Twitter) YouTube Facebook
Trending
  • South Korea’s Largest Hydrogen-Only Fuel Cell Plant Begins Operation in Ulsan
  • Ingeteam Commissions Castilla y León’s First Green Hydrogen Plant
  • Norway’s Karmsund Hydrogen Project to Begin Operations in 2028
  • ITM Power Bets on ‘Hydrogen-as-a-Service’ with New German Subsidiary Hydropulse
  • Greece Weighs Hydrogen Ambitions Against Power Costs and Lack of Subsidies
  • Teesside to Anchor £96M Pipeline Push as Ofgem Backs East Coast Hydrogen Network
  • RIC Energy Secures Site for 220MW Hydrogen-Based E-Fuels Project in Castilla y León
  • ITM Power Gets FEED Contract for Uniper’s Humber H2ub
LinkedIn X (Twitter) YouTube Facebook
Energy NewsEnergy News
  • NEWS
    • Breaking News
    • Hydrogen
    • Energy Storage
    • Grid
    • SMR
    • Projects
    • Production
    • Transport
    • Research
  • SPOTLIGHT
    • Interviews
    • Face 2 Face
    • Podcast
    • Webinars
    • Analysis
    • Columnists
    • Reviews
    • Events
  • REGIONAL
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle east
    • Pacific
  • COMMUNITY
  • ABOUT
    • Advisory Board
    • Contact us
    • Report Your News
    • Advertize
    • Subscribe
Energy NewsEnergy News
Home Home - Analysis
Green Hydrogen H2 News

New report provides insight how India could overcome drag on wind market growth

Anela DoksoBy Anela Dokso14/05/20204 Mins Read
Share
LinkedIn Twitter Facebook Email WhatsApp Telegram

Global Wind Energy Council (GWEC) and MEC+ (MEC Intelligence) have released a new report stating that India’s wind energy capacity can only realistically reach 50 GW by 2022.

‘India Wind Outlook Towards 2022: Looking beyond the headwinds‘ objectively analyses the factors which have led to a drag on market growth for India’s wind energy industry over the past two years, and provides an assessment on the forecast along with a pathway to overcome these challenges to realize the high potential of the market.

The report highlights key challenges that must be overcome to restore strong wind market growth in India, including: grid and land availability; off-taker risks; onerous tender conditions; and low tariff caps. Collectively, these challenges have led to the last three central wind tenders and all state wind tenders to be unsubscribed, re-tendered or even cancelled, while 80 per cent of awarded projects have been delayed by 6-12 months.

Three scenarios for new wind installations in India until 2022 are highlighted in the report, ranging from 11-17 GW of installations depending on the extent and speed with which the government and industry are able to resolve these challenges.

In 2020, supply chain disruptions due to the impact of the COVID-19 crisis will further compound existing challenges to delay around 0.7-1.1 GW in new volume to 2021 and also possible cancellation of some planned auctions.

India is the world’s fourth-largest onshore wind market by installations, with 37.5 GW of capacity as of 2019, and has the potential for more than 695 GW at 120 metres.

Wind is already the second most competitive energy source on India’s grid today, and the government has set a target to reach total wind capacity of 60 GW by 2022 and 140 GW by 2030. However, project installation has been decelerating recently, with only 2.3 GW installed in 2019, nearly half of the 4.1 GW installed in 2017. The report finds that even in the high case scenario, the country is likely to fall short of its ambitious wind energy target for 2022.

“India has been one of the world’s largest wind energy markets for many years, and the government has put in place ambitious renewable energy targets in order to fulfill the country’s growing energy demand, which is set to double over the next ten years. While we applaud the leadership which the Indian government has shown, the targets alone are simply not enough to ensure the market grows at the right pace to reach its objectives. Setting realistic prices, a faster build out of grid infrastructure, ensuring market liquidity and streamlining land allocation and site development will be crucial to revive auction appetite and accelerate execution of India’s pipeline of wind energy projects”.

“Ultimately, India must overcome the challenges identified in the report not only to get its wind market growth back on track, but to also to provide new investment opportunities, jobs and affordable energy to contribute to the country’s economic recovery from the COVID-19 crisis.”

Ben Backwell, CEO at GWEC.

“India’s wind market growth has been slow over the past two years, and growth will continue to be uneven until 2022. The current COVID-19 crisis is aggravating the situation as supply chain disruptions, manufacturing and transport restrictions,  and economic uncertainty are adding further obstacles for the industry both in India and in other markets who rely on India as the second largest export hub for wind energy components in the world. The immediate impact of COVID 19 will be delay in the projects scheduled for Q1, Q2 2020, however, more far reaching results can impact up to 3.5 GW of volumes due to projects with thinly spread developers, financial crisis and limited new auctions.”

Sidharth Jain, founder and CEO at MEC+ .
Share. LinkedIn Twitter Facebook Email

Related Posts

Europe's Geothermal Future Hinges on Open Geological Data, Say Survey Agencies

Europe’s Geothermal Future Hinges on Open Geological Data, Say Survey Agencies

24/06/2025
hydrogen

Adani Commissions India’s First 5 MW Off-Grid Green Hydrogen Plant in Gujarat

23/06/2025
energy

India’s Battery Storage VGF Scheme Targets 30 GWh Amid Falling Costs and Rising Grid Pressures

20/06/2025
Climate Misinformation Emerges as Critical Threat to Global Emissions Targets, IPIE Warns

Climate Misinformation Emerges as Critical Threat to Global Emissions Targets, IPIE Warns

19/06/2025
hydrogen

China’s Quiet Hydrogen Revolution

19/06/2025
Circular Economy

The $3 Trillion Opportunity: Circular Economy Markets Outpace Traditional Forecasts

18/06/2025
Hydrogen

South Korea’s Largest Hydrogen-Only Fuel Cell Plant Begins Operation in Ulsan

25/06/2025
Hydrogen

Ingeteam Commissions Castilla y León’s First Green Hydrogen Plant

25/06/2025
hydrogen

Norway’s Karmsund Hydrogen Project to Begin Operations in 2028

25/06/2025
hydrogen

ITM Power Bets on ‘Hydrogen-as-a-Service’ with New German Subsidiary Hydropulse

25/06/2025

Subscribe to Updates

Get the latest news from the hydrogen market subscribe to our newsletter.

LinkedIn X (Twitter) Facebook YouTube

News

  • Inteviews
  • Webinars
  • Hydrogen
  • Spotlight
  • Regional

Company

  • Advertising
  • Media Kits
  • Contact Info
  • GDPR Policy

Subscriptions

  • Subscribe
  • Newsletters
  • Sponsored News

Subscribe to Updates

Get the latest news from EnergyNewsBiz about hydrogen.

© 2025 EnergyNews.biz
  • Privacy Policy
  • Terms
  • Accessibility

Type above and press Enter to search. Press Esc to cancel.