The Nordex Group has received another big order for the Delta4000 series N149/4.0-4.5.

The developer of the wind farm has placed an order with the Nordex Group for 63 turbines for a project in the United States.

The project and customer are undisclosed.

In the summer of 2021, the Nordex Group will begin to supply and install turbines for this project in the state of Texas. The turbines are to be supplied in a project-specific operating mode of 4.8 MW, resulting in a cumulative wind farm output of 302.4 MW.

With this new order from the USA, the Nordex Group will look back on 3.7 gigawatts of turbines sold in the state of Texas alone.

Share.
Exit mobile version