Trianel Erneuerbare Energien GmbH (TEE) has acquired its largest wind farm to date from ABO Wind AG.
The wind farm, named Dreieck Spreeau, is located in Brandenburg, eastern Germany.
The Spreeau wind farm consists of eight Vestas V150-4.2MW wind turbines. The project is the largest in Germany to use the V150-4.2MW turbines.
With a total output of 33.6 MW, the wind farm is the largest in the TEE portfolio to date.
The wind farm is being built by ABO Wind and the commissioning is planned for the end of 2021.
The wind farm will produce around 110 million kilowatt hours per year.