HydrogenPro plans to invest in new production line
For its Gen3 electrodes, HydrogenPro plans to invest in a new production line. With a minimum yearly capacity of 90–100 MW, production is anticipated to begin in Q1 2025.
Over a considerable amount of time, HydrogenPro ASA has created a novel Gen3 electrode technology that lowers the Levelized Cost of Hydrogen and allows electrolyzers to generate with industry-leading efficiency. The capacity to produce huge electrodes will be quadrupled with the new production line.
Green hydrogen fuel cell locomotive tenders from NTPC
In order to operate the green hydrogen fuel cell locomotives at NTPC Sipat’s merry-go-round rail system, the company has invited proposals. The scope of work assigned to the prospective contractor includes basic design for retrofitting an existing locomotive or designing a new one, detailed engineering, procurement, fabrication, inspection, material supply, storage, commissioning, testing, PG test, and training. It also includes 20 years of turnkey maintenance work on all systems.