Close Menu
Energy NewsEnergy News
  • NEWS
    • Breaking News
    • Hydrogen
    • Energy Storage
    • Grid
    • SMR
    • Projects
    • Production
    • Transport
    • Research
  • SPOTLIGHT
    • Interviews
    • Face 2 Face
    • Podcast
    • Webinars
    • Analysis
    • Columnists
    • Reviews
    • Events
  • REGIONAL
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle east
    • Pacific
  • COMMUNITY
  • ABOUT
    • Advisory Board
    • Contact us
    • Report Your News
    • Advertize
    • Subscribe
LinkedIn X (Twitter) YouTube Facebook
Trending
  • Nikola’s Hydrogen Dreams Dissolve as Assets Head to Auction Block
  • EnviaM ‘Green Bridge’ Exit Underscores Challenges for Germany’s Green Hydrogen Plans
  • French Audit Court Warns Hydrogen Strategy Is ‘Ambitious but Unrealistic,’ Flags Funding Misalignment
  • Alleged Climate Lawsuit Funding Sparks Industrial Backlash Amid Hydrogen Policy Tensions
  • China Approves $780M Green Hydrogen Project in Bayannur as Industry Eyes Scale and Storage
  • Fortescue Shifts Focus from Green Hydrogen as Key Executive Departs Amid Strategic Recalibration
  • McPhy Struggles to Attract Buyers Before Liquidation Looms
  • New NEXO Launches Amid Structural Headwinds in South Korea’s Hydrogen Mobility Push
LinkedIn X (Twitter) YouTube Facebook
Energy NewsEnergy News
  • NEWS
    • Breaking News
    • Hydrogen
    • Energy Storage
    • Grid
    • SMR
    • Projects
    • Production
    • Transport
    • Research
  • SPOTLIGHT
    • Interviews
    • Face 2 Face
    • Podcast
    • Webinars
    • Analysis
    • Columnists
    • Reviews
    • Events
  • REGIONAL
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle east
    • Pacific
  • COMMUNITY
  • ABOUT
    • Advisory Board
    • Contact us
    • Report Your News
    • Advertize
    • Subscribe
Energy NewsEnergy News
Home Home - Featured
Green Hydrogen H2 News

Vena Energy Australia achieves financial close for Queensland’s BESS

Anela DoksoBy Anela Dokso16/12/20202 Mins Read
Share
LinkedIn Twitter Facebook Email WhatsApp Telegram

Vena Energy Australia has achieved financial close for Queensland’s biggest battery energy storage system (BESS), capable of discharging up to 100 megawatts (MW) and storing 150 megawatt hours of energy, equivalent to powering up to 57,000 Australian homes.

Construction of the $120 million Wandoan South BESS started in October, after awarding the engineering, procurement, and construction (EPC) contract to Doosan GridTech Australia. This follows the 15-year deal signed by Australian energy generator and retailer AGL for full operational dispatch rights for what will be Queensland’s biggest battery, and the second largest in Australia.

“We are delighted to be delivering the first stage of Vena Energy’s Wandoan South Project in the Western Downs region of south-west Queensland. The Wandoan South BESS represents the first milestone of Vena Energy’s overarching Wandoan South Project, approved to generate up to 650 MW of solar electricity, and 450 MW of energy storage across several stages.

“We look forward to participating in the transition towards renewable energy in Queensland by delivering the Wandoan South BESS in the heart of the Western Downs. The BESS represents a step change in Queensland’s transition to a cleaner energy future and will lead the way for more investment in Queensland’s adoption of renewable energy.”

Anil Nangia, head of Vena Energy Australia.

“The controller is the intelligence of the BESS system, allowing for the coordination of complex schedules and operating modes within the facility’s system platform.”

Doosan GridTech Australia general manager, Adrian Marziano.

“As part of our agreement, AGL will have full operational dispatch rights once it begins operating in 2021, providing critical support to our growing portfolio of energy storage assets.

“Grid-scale batteries like Wandoan South BESS allow AGL to leverage excess solar and wind generation in Queensland while providing capacity when renewable sources are not generating.”

AGL COO, Markus Brokhof.

In Australia, Vena Energy is progressing over 2.5 gigawatts of renewable energy projects across the country. The Wandoan South BESS will be the first construction milestone of the Wandoan South Project.

Share. LinkedIn Twitter Facebook Email

Related Posts

Nikola’s Hydrogen Dreams Dissolve as Assets Head to Auction Block

Nikola’s Hydrogen Dreams Dissolve as Assets Head to Auction Block

11/06/2025
hydrogen

EnviaM ‘Green Bridge’ Exit Underscores Challenges for Germany’s Green Hydrogen Plans

11/06/2025
hydrogen

French Audit Court Warns Hydrogen Strategy Is ‘Ambitious but Unrealistic,’ Flags Funding Misalignment

11/06/2025
Green Hydrogen

Alleged Climate Lawsuit Funding Sparks Industrial Backlash Amid Hydrogen Policy Tensions

11/06/2025
hydrogen

China Approves $780M Green Hydrogen Project in Bayannur as Industry Eyes Scale and Storage

11/06/2025
McPhy Struggles to Attract Buyers Before Liquidation Looms

McPhy Struggles to Attract Buyers Before Liquidation Looms

10/06/2025
Nikola’s Hydrogen Dreams Dissolve as Assets Head to Auction Block

Nikola’s Hydrogen Dreams Dissolve as Assets Head to Auction Block

11/06/2025
hydrogen

EnviaM ‘Green Bridge’ Exit Underscores Challenges for Germany’s Green Hydrogen Plans

11/06/2025
hydrogen

French Audit Court Warns Hydrogen Strategy Is ‘Ambitious but Unrealistic,’ Flags Funding Misalignment

11/06/2025
Green Hydrogen

Alleged Climate Lawsuit Funding Sparks Industrial Backlash Amid Hydrogen Policy Tensions

11/06/2025

Subscribe to Updates

Get the latest news from the hydrogen market subscribe to our newsletter.

LinkedIn X (Twitter) Facebook YouTube

News

  • Inteviews
  • Webinars
  • Hydrogen
  • Spotlight
  • Regional

Company

  • Advertising
  • Media Kits
  • Contact Info
  • GDPR Policy

Subscriptions

  • Subscribe
  • Newsletters
  • Sponsored News

Subscribe to Updates

Get the latest news from EnergyNewsBiz about hydrogen.

© 2025 EnergyNews.biz
  • Privacy Policy
  • Terms
  • Accessibility

Type above and press Enter to search. Press Esc to cancel.