Demo
Join Our Newsletter

LOC has won a contract to provide Marine Warranty Services (MWS) for transport and installation operations to support the construction of offshore wind farms Zhanjiang Wailuo II and X in China.

Guangdong Energy Group is the owner of the offshore wind farm.

Under the terms of the deal, LOC will provide the proposed fleet with document review and verification, inspection, and suitability surveys to support OWF development and monitoring of critical operations.

The Zhanjiang Wailuo offshore wind farm II consists of 37 wind turbines, with a total installed capacity of 203.5ME. Turbines will be installed in water depths of up to 19 meters. Zhanjiang Wailuo offshore wind farm X includes another 37 wind turbines, each with an installed capacity of 203.5ME.

Zhanjiang Wailuo offshore wind farm II, located east of Zhanjiang City, Guangdong Province, in Southern China, is planned to start operations by the end of June 2021. Zhanjiang Wailuo offshore wind farm X is located in Xinliao Island’s North Sea location, and is expected to start operations in June 2020.

Add EnergyNews.biz as a preferred source on Google

Share.

Arnes Biogradlija is the founder and Editor in Chief of EnergyNews.biz, which he launched in 2021 to separate energy transition realities from fairy tales. He writes data driven analysis on hydrogen, energy storage, small modular reactors, grids and industrial policy, and leads the Energy Talks interview series. EnergyNews.biz reporting has been cited more than 100 times by the International Energy Agency.

Comments are closed.