Close Menu
Energy NewsEnergy News
  • NEWS
    • Breaking News
    • Hydrogen
    • Energy Storage
    • Grid
    • SMR
    • Projects
    • Production
    • Transport
    • Research
  • SPOTLIGHT
    • Interviews
    • Face 2 Face
    • Podcast
    • Webinars
    • Analysis
    • Columnists
    • Reviews
    • Events
  • REGIONAL
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle east
    • Pacific
  • COMMUNITY
  • ABOUT
    • Advisory Board
    • Contact us
    • Report Your News
    • Advertize
    • Subscribe
LinkedIn X (Twitter) YouTube Facebook
Trending
  • Fortescue Secures $2bn Loan, But Green Hydrogen Projects Remain on Hold
  • Sarawak’s Hydrogen Bus Push Faces Reliability and Cost Concerns
  • India’s Renewable Push Faces Slowdown as Storage-Linked Projects Dominate Tenders
  • Bintulu Port Signs Trio of MoUs to Advance Hydrogen, Bio-LNG and SAF Development
  • Infrastructure Bottlenecks Force Major Hydrogen Project Restructuring in Netherlands
  • CATL’s Ning Service Targets NEV Repair Bottleneck with CTP Battery Maintenance Solution
  • Pumped Hydro Beats Batteries in 40% Renewable Transition
  • China’s 40% Global Hydrogen FID Lead: PowerChina’s Uzbekistan Plant Tests Central Asian Market Strategy
LinkedIn X (Twitter) YouTube Facebook
Energy NewsEnergy News
  • NEWS
    • Breaking News
    • Hydrogen
    • Energy Storage
    • Grid
    • SMR
    • Projects
    • Production
    • Transport
    • Research
  • SPOTLIGHT
    • Interviews
    • Face 2 Face
    • Podcast
    • Webinars
    • Analysis
    • Columnists
    • Reviews
    • Events
  • REGIONAL
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle east
    • Pacific
  • COMMUNITY
  • ABOUT
    • Advisory Board
    • Contact us
    • Report Your News
    • Advertize
    • Subscribe
Energy NewsEnergy News
Home Home - Energy Storage
ev

CATL’s Ning Service Targets NEV Repair Bottleneck with CTP Battery Maintenance Solution

Anela DoksoBy Anela Dokso12/08/20252 Mins Read
Share
LinkedIn Twitter Facebook Email WhatsApp Telegram

As China’s new energy vehicle (NEV) penetration rate surpasses 50%, the first major wave of EVs is exiting warranty coverage—exposing a costly weak spot in the sector’s after-sales ecosystem.

Power battery replacements remain the single largest expense in NEV maintenance, with the China Insurance Association reporting an average parts-to-whole ratio of 50.96% for battery packs across 59 pure electric models. In practice, that means replacing the battery in a 200,000 yuan ($27,500) NEV can exceed 100,000 yuan ($13,750), forcing many owners into the “replace, don’t repair” trap. The challenge is particularly acute for vehicles equipped with Cell-to-Pack (CTP) technology—now widely adopted for its higher volumetric energy density but notoriously difficult to repair due to its high integration.

CATL’s independent aftermarket arm, Ning Service, is attempting to shift that dynamic. Launched as a standalone brand in 2024 after nearly a decade as CATL’s internal service department, Ning Service is now offering CTP battery repair in Shanghai. The company claims that targeted repairs can reduce costs to 10,000–20,000 yuan ($1,375–$2,750)—a fraction of the replacement price—although, for now, the service applies exclusively to CATL-manufactured batteries. The brand has expanded to over 1,100 service outlets in 75 countries, with more than 800 in China, providing battery testing, maintenance, refurbishment, recycling, and cascade utilization.

CATL frames Ning Service not just as a repair provider but as a means to create a closed-loop battery lifecycle. By retaining value from used packs through repair and refurbishment, the company positions itself to ease pressure on raw material demand while lowering total cost of ownership for consumers.


Stay updated on the latest in energy! Follow us on LinkedIn, Facebook, and X for real-time news and insights. Don’t miss out on exclusive interviews and webinars—subscribe to our YouTube channel today! Join our community and be part of the conversation shaping the future of energy.

battery energy storage
Share. LinkedIn Twitter Facebook Email

Related Posts

Fortescue Secures $2bn Loan, But Green Hydrogen Projects Remain on Hold

Fortescue Secures $2bn Loan, But Green Hydrogen Projects Remain on Hold

12/08/2025
Sarawak's Hydrogen Bus Push Faces Reliability and Cost Concerns

Sarawak’s Hydrogen Bus Push Faces Reliability and Cost Concerns

12/08/2025
hydrogen

India’s Renewable Push Faces Slowdown as Storage-Linked Projects Dominate Tenders

12/08/2025
hydrogen

Bintulu Port Signs Trio of MoUs to Advance Hydrogen, Bio-LNG and SAF Development

12/08/2025
Hydrogen

Infrastructure Bottlenecks Force Major Hydrogen Project Restructuring in Netherlands

12/08/2025
Batteries

Pumped Hydro Beats Batteries in 40% Renewable Transition

11/08/2025
Fortescue Secures $2bn Loan, But Green Hydrogen Projects Remain on Hold

Fortescue Secures $2bn Loan, But Green Hydrogen Projects Remain on Hold

12/08/2025
Sarawak's Hydrogen Bus Push Faces Reliability and Cost Concerns

Sarawak’s Hydrogen Bus Push Faces Reliability and Cost Concerns

12/08/2025
hydrogen

India’s Renewable Push Faces Slowdown as Storage-Linked Projects Dominate Tenders

12/08/2025
hydrogen

Bintulu Port Signs Trio of MoUs to Advance Hydrogen, Bio-LNG and SAF Development

12/08/2025

Subscribe to Updates

Get the latest news from the hydrogen market subscribe to our newsletter.

LinkedIn X (Twitter) Facebook YouTube

News

  • Inteviews
  • Webinars
  • Hydrogen
  • Spotlight
  • Regional

Company

  • Advertising
  • Media Kits
  • Contact Info
  • GDPR Policy

Subscriptions

  • Subscribe
  • Newsletters
  • Sponsored News

Subscribe to Updates

Get the latest news from EnergyNewsBiz about hydrogen.

© 2025 EnergyNews.biz
  • Privacy Policy
  • Terms
  • Accessibility

Type above and press Enter to search. Press Esc to cancel.