A significant agreement has been reached by Conrad Energy and KX Power to boost the efficiency of the Lincolnshire Battery Energy Storage System (BESS).
This facility, a high-tech 80MW/160MW installation in Immingham, aims to enhance its performance and efficiency with expert management.
Through the expertise of Conrad Energy’s trading desk, KX Power’s site will ensure its storage resources are utilized effectively. This strategy includes trading and dispatching stored energy in the optimal market conditions and timings to maximize both profitability and system longevity.
Damian Darragh, Chairman of Conrad Energy, expressed excitement about the project, highlighting their goal to operate the advanced 160MWh system efficiently. The partnership aims to provide crucial stability and adaptability to the Great Britain network over the next few years.
KX Power’s Confidence Olivia He, Chief Investment Officer at KX Power, noted their confidence in Conrad Energy’s proven ability to optimize energy assets. She emphasized that the collaboration is expected to achieve maximal efficiency for the Immingham battery system.
Stay updated on the latest in energy! Follow us on LinkedIn, Facebook, and X for real-time news and insights. Don’t miss out on exclusive interviews and webinars—subscribe to our YouTube channel today! Join our community and be part of the conversation shaping the future of energy.