Close Menu
Energy NewsEnergy News
  • NEWS
    • Breaking News
    • Hydrogen
    • Energy Storage
    • Grid
    • SMR
    • Projects
    • Production
    • Transport
    • Research
  • SPOTLIGHT
    • Interviews
    • Face 2 Face
    • Podcast
    • Webinars
    • Analysis
    • Columnists
    • Reviews
    • Events
  • REGIONAL
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle east
    • Pacific
  • COMMUNITY
  • ABOUT
    • Advisory Board
    • Contact us
    • Report Your News
    • Advertize
    • Subscribe
LinkedIn X (Twitter) YouTube Facebook
Trending
  • Air Liquide Commits €500M to Rotterdam’s ELYgator Hydrogen Project
  • Chile Launches $2.8B Hydrogen Tax Credit to Unlock Stalled Projects
  • Green Hydrogen Faces Global Reality Check as EU Targets Slip Out of Reach
  • Google Backs CO₂ Battery Storage in Global Push for 24-Hour Clean Power Reliability
  • HyCARB Secures €45.7M for Green Hydrogen R&D
  • UK Green Hydrogen Projects Clear Funding Hurdle After Year-Long Delay, But Questions Linger Over
  • ArcelorMittal Halts Dunkirk Hydrogen DRI Project Amid Policy Delays and Economic Headwinds
  • GEGHA Project Redefines Hydrogen Deployment in Australia’s Agricultural Heartland
LinkedIn X (Twitter) YouTube Facebook
Energy NewsEnergy News
  • NEWS
    • Breaking News
    • Hydrogen
    • Energy Storage
    • Grid
    • SMR
    • Projects
    • Production
    • Transport
    • Research
  • SPOTLIGHT
    • Interviews
    • Face 2 Face
    • Podcast
    • Webinars
    • Analysis
    • Columnists
    • Reviews
    • Events
  • REGIONAL
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle east
    • Pacific
  • COMMUNITY
  • ABOUT
    • Advisory Board
    • Contact us
    • Report Your News
    • Advertize
    • Subscribe
Energy NewsEnergy News
Home Home - Energy Storage
Green Hydrogen

Koorangie Battery Powers Up, Grid-Forming Inverters Redefine System Strength in Victoria

Anela DoksoBy Anela Dokso24/07/20253 Mins Read
Share
LinkedIn Twitter Facebook Email WhatsApp Telegram

Australia’s energy transition has reached another critical inflection point with the commissioning of the 125 MW/250 MWh Koorangie Battery Energy Storage System (BESS) in Victoria.

Backed by a 20-year contract with the Australian Energy Market Operator (AEMO), the facility marks a significant shift in how storage systems can deliver both dispatchable capacity and critical system strength services, historically the domain of synchronous fossil-fuel generators.

Located west of Kerang, the Koorangie battery was developed by Sydney-based Edify Energy and constructed by Consolidated Power Projects (CPP). It now operates at full nameplate capacity using 100 Tesla Megapacks equipped with grid-forming inverters in “virtual machine mode.” These inverters replicate the dynamic behaviour of synchronous machines, stabilizing frequency and voltage—functions central to maintaining a reliable grid with high shares of inverter-based renewables.

The technology’s deployment is not incidental. The Murray River region, where the battery is located, has long been a bottleneck for renewable energy export due to limited grid strength. AEMO’s System Support Agreement with the project is intended to address precisely this constraint, providing 125 MW of system strength and unlocking an estimated 300 MW of additional hosting capacity for inverter-based resources such as wind and solar.

While much attention in battery markets has focused on arbitrage and frequency response, the Koorangie project illustrates a maturation in BESS applications. Edify Energy Executive Chairman John Cole described the facility as a dual-purpose asset—simultaneously offering storage and grid-stabilizing services.

The economics behind the project are equally notable. Alongside its system strength role, the battery has secured a 15-year offtake agreement with Shell Energy Australia, ensuring long-term revenue certainty. While the terms of the offtake have not been disclosed, the dual-market model of revenue—contracted system support plus energy market participation—reflects a growing trend in the commercial structure of utility-scale batteries.

The Koorangie BESS is one of 12 projects supported by the Victorian government’s Renewable Energy Zone Fund. Victoria’s legislated storage targets—2.6 GW by 2030 and 6.3 GW by 2035—signal a policy environment increasingly supportive of large-scale storage infrastructure. According to Victorian Energy Minister Lily D’Ambrosio, the project underscores the state’s commitment to replacing fossil-fuel-based system services with clean technology alternatives. “The grid-forming inverters will allow the battery to replace the type of system strength services that were once only provided by fossil-fuel generators,” she said.

Koorangie also builds on Edify’s existing presence in the region, sitting adjacent to its 50 MW Gannawarra solar farm and 25 MW/50 MWh battery. With 12 commercial projects now operational and over 1 GW of solar and storage developed or financed, Edify continues to position itself at the frontier of Australia’s clean energy buildout.


Stay updated on the latest in energy! Follow us on LinkedIn, Facebook, and X for real-time news and insights. Don’t miss out on exclusive interviews and webinars—subscribe to our YouTube channel today! Join our community and be part of the conversation shaping the future of energy.

energy storage
Share. LinkedIn Twitter Facebook Email

Related Posts

Air Liquide Commits €500M to Rotterdam’s ELYgator Hydrogen Project

Air Liquide Commits €500M to Rotterdam’s ELYgator Hydrogen Project

25/07/2025
Hydrogen

Chile Launches $2.8B Hydrogen Tax Credit to Unlock Stalled Projects

25/07/2025
Green Hydrogen Faces Global Reality Check as EU Targets Slip Out of Reach

Green Hydrogen Faces Global Reality Check as EU Targets Slip Out of Reach

25/07/2025
Google

Google Backs CO₂ Battery Storage in Global Push for 24-Hour Clean Power Reliability

25/07/2025
Hydrogen

HyCARB Secures €45.7M for Green Hydrogen R&D

25/07/2025
UK Green Hydrogen Projects Clear Funding Hurdle After Year-Long Delay, But Questions Linger Over

UK Green Hydrogen Projects Clear Funding Hurdle After Year-Long Delay, But Questions Linger Over

24/07/2025
Air Liquide Commits €500M to Rotterdam’s ELYgator Hydrogen Project

Air Liquide Commits €500M to Rotterdam’s ELYgator Hydrogen Project

25/07/2025
Hydrogen

Chile Launches $2.8B Hydrogen Tax Credit to Unlock Stalled Projects

25/07/2025
Green Hydrogen Faces Global Reality Check as EU Targets Slip Out of Reach

Green Hydrogen Faces Global Reality Check as EU Targets Slip Out of Reach

25/07/2025
Google

Google Backs CO₂ Battery Storage in Global Push for 24-Hour Clean Power Reliability

25/07/2025

Subscribe to Updates

Get the latest news from the hydrogen market subscribe to our newsletter.

LinkedIn X (Twitter) Facebook YouTube

News

  • Inteviews
  • Webinars
  • Hydrogen
  • Spotlight
  • Regional

Company

  • Advertising
  • Media Kits
  • Contact Info
  • GDPR Policy

Subscriptions

  • Subscribe
  • Newsletters
  • Sponsored News

Subscribe to Updates

Get the latest news from EnergyNewsBiz about hydrogen.

© 2025 EnergyNews.biz
  • Privacy Policy
  • Terms
  • Accessibility

Type above and press Enter to search. Press Esc to cancel.