Close Menu
Energy NewsEnergy News
  • NEWS
    • Breaking News
    • Hydrogen
    • Energy Storage
    • Grid
    • SMR
    • Projects
    • Production
    • Transport
    • Research
  • SPOTLIGHT
    • Interviews
    • Face 2 Face
    • Podcast
    • Webinars
    • Analysis
    • Columnists
    • Reviews
    • Events
  • REGIONAL
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle east
    • Pacific
  • COMMUNITY
  • ABOUT
    • Advisory Board
    • Contact us
    • Report Your News
    • Advertize
    • Subscribe
LinkedIn X (Twitter) YouTube Facebook
Trending
  • Turning Waste into Watts: Researchers Harness Heavy Metals in Wastewater for Green Hydrogen Production
  • Tata Steel to Retire Coal-Based Blast Furnace at IJmuiden in €1.5B Hydrogen-Ready Overhaul
  • Copper-Doping Unlocks Stable, High-Performance Sodium-Ion Batteries for Scalable Energy Storage
  • Stellantis Halts Hydrogen Van Program, Signaling Broader Industry Retrenchment
  • Hygenco Launches Green Hydrogen Supply to Sterlite Technologies
  • Primary Hydrogen Accelerates Natural Hydrogen Exploration with Phase 2 Soil Sampling in British Columbia
  • Moeve and Zaffra Target e-SAF Deployment at Green Hydrogen Hub
  • Kazakhstan and South Korea’s YPP Sign $3.1B Pact for Green Hydrogen and Ammonia
LinkedIn X (Twitter) YouTube Facebook
Energy NewsEnergy News
  • NEWS
    • Breaking News
    • Hydrogen
    • Energy Storage
    • Grid
    • SMR
    • Projects
    • Production
    • Transport
    • Research
  • SPOTLIGHT
    • Interviews
    • Face 2 Face
    • Podcast
    • Webinars
    • Analysis
    • Columnists
    • Reviews
    • Events
  • REGIONAL
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle east
    • Pacific
  • COMMUNITY
  • ABOUT
    • Advisory Board
    • Contact us
    • Report Your News
    • Advertize
    • Subscribe
Energy NewsEnergy News
Home Home - Americas
Green Hydrogen H2 News

New DOE funding for FLExible Carbon Capture and Storage program

Anela DoksoBy Anela Dokso14/07/20202 Mins Read
Share
LinkedIn Twitter Facebook Email WhatsApp Telegram

The U.S. Department of Energy (DOE) has granted $11.5 million in funding for 12 projects as part of Phase 1 of the Advanced Research Projects Agency-Energy’s (ARPA-E) FLExible Carbon Capture and Storage (FLECCS) program.

FLECCS project teams will work to develop carbon capture and storage (CCS) processes that better enable technologies, such as natural gas power generators, to be responsive to grid conditions in a high variable renewable energy (VRE) penetration environment.

“The FLECCS projects will work to address critical carbon capture and storage needs in our nation’s power systems. The FLECCS program is intended to enable the next generation of flexible, low-cost, and low-carbon electricity systems, and we are eager to work with these teams to innovate the grid of the future.”

ARPA-E director Lane Genatowski.

FLECCS project teams are developing CCS retrofits to existing power generators as well as greenfield systems that intake fossil carbon-containing fuel like natural gas or bio-gas and output electricity. 

FLECCS Phase 1 teams will design, model, and optimize CCS processes that enable flexibility on a high-VRE grid. Later in the program, teams that move to Phase 2 will focus on building components, unit operations, and prototype systems to reduce technical risks and costs.

In FLECCS Phase 2, up to $31 million in additional funding will be available for teams. At the conclusion of the Phase 1 period, teams will be down-selected based on an engineering design review and the projected economic impact of their Phase 1 projects on a future electricity grid.

Selected teams will move on to receive additional funding, further develop their technologies and address Phase 2 challenges.

Share. LinkedIn Twitter Facebook Email

Related Posts

hydrogen

Stellantis Halts Hydrogen Van Program, Signaling Broader Industry Retrenchment

17/07/2025
Hydrogen

Primary Hydrogen Accelerates Natural Hydrogen Exploration with Phase 2 Soil Sampling in British Columbia

16/07/2025
Daimler Truck Defers Hydrogen Rollout but Maintains Strategic Confidence in Long-Term Value

Daimler Truck Defers Hydrogen Rollout but Maintains Strategic Confidence in Long-Term Value

15/07/2025
Chile's $16B H2 Magallanes Green Hydrogen Project Faces Environmental Pushback

Chile’s $16B H2 Magallanes Green Hydrogen Project Faces Environmental Pushback

15/07/2025
U.S. Green Hydrogen Projects Face Tight Timeline Despite 45V Tax Credit Reprieve

U.S. Green Hydrogen Projects Face Tight Timeline Despite 45V Tax Credit Reprieve

14/07/2025
Plug Power Secures Multi-Year Hydrogen Supply Deal to Bolster U.S. Market Expansion

Plug Power Secures Multi-Year Hydrogen Supply Deal to Bolster U.S. Market Expansion

11/07/2025
hydrogen

Turning Waste into Watts: Researchers Harness Heavy Metals in Wastewater for Green Hydrogen Production

17/07/2025
hydrogen

Tata Steel to Retire Coal-Based Blast Furnace at IJmuiden in €1.5B Hydrogen-Ready Overhaul

17/07/2025
Copper-Doping Unlocks Stable, High-Performance Sodium-Ion Batteries for Scalable Energy Storage

Copper-Doping Unlocks Stable, High-Performance Sodium-Ion Batteries for Scalable Energy Storage

17/07/2025
hydrogen

Stellantis Halts Hydrogen Van Program, Signaling Broader Industry Retrenchment

17/07/2025

Subscribe to Updates

Get the latest news from the hydrogen market subscribe to our newsletter.

LinkedIn X (Twitter) Facebook YouTube

News

  • Inteviews
  • Webinars
  • Hydrogen
  • Spotlight
  • Regional

Company

  • Advertising
  • Media Kits
  • Contact Info
  • GDPR Policy

Subscriptions

  • Subscribe
  • Newsletters
  • Sponsored News

Subscribe to Updates

Get the latest news from EnergyNewsBiz about hydrogen.

© 2025 EnergyNews.biz
  • Privacy Policy
  • Terms
  • Accessibility

Type above and press Enter to search. Press Esc to cancel.