Demo
Join Our Newsletter

The Nordex Group has been hired by Ignitis Group, Lithuania’s state-owned energy holding firm, to supply 14 N149/4.0-4.5 turbines.

The Delta4000 series turbines are planned for the 63 MW Mazeikiai wind farm in the country’s northwest region. The deal also includes a 15-year premium service contract for the turbines.

The infrastructure work is due to begin in the middle of this year, with turbine distribution and installation planned for 2022. The Nordex Group will mount the turbines on tubular steel towers – eight with hub heights of 155 meters and six with hub heights of 145 meters – to achieve the maximum yields at the site, which has average annual wind speeds of 7 meters per second. The turbines will be operational in the 4.5 MW mode until completed.

Add EnergyNews.biz as a preferred source on Google

Share.

Arnes Biogradlija is the founder and Editor in Chief of EnergyNews.biz, which he launched in 2021 to separate energy transition realities from fairy tales. He writes data driven analysis on hydrogen, energy storage, small modular reactors, grids and industrial policy, and leads the Energy Talks interview series. EnergyNews.biz reporting has been cited more than 100 times by the International Energy Agency.

Comments are closed.