Demo
Join Our Newsletter

The global developer of the wpd project has placed another order for the N163 / 5.X turbines from the Nordex Group.

Nordex Group will supply 17 Delta4000 series turbines for the 96.9 MW “Nuolivaara” wind farm. The order also includes a 15-year premium service contract with the option to extend it for another 5 years.

The “Nuolivaara” wind farm will be built approximately 25 kilometers northeast of the center of Kemijärvi. The municipalities of Kemijärvi and Salla in northern Finland. Due to the harsh and cold climate in the northern part of the polar circle, Nordex Group will supply a version of the turbine for the cold climate.

This means that the turbine can operate in temperatures as low as -30 C. The rotor blades will be equipped with an advanced anti-freeze system. This system prevents the rotor blades from freezing before ice begins to form. Since the turbine can run continuously even in harsh Nordic conditions, it can significantly reduce energy loss.

Add EnergyNews.biz as a preferred source on Google

Share.

Arnes Biogradlija is the founder and Editor in Chief of EnergyNews.biz, which he launched in 2021 to separate energy transition realities from fairy tales. He writes data driven analysis on hydrogen, energy storage, small modular reactors, grids and industrial policy, and leads the Energy Talks interview series. EnergyNews.biz reporting has been cited more than 100 times by the International Energy Agency.

Comments are closed.