Demo
Join Our Newsletter

Pescara electric buses will triple in number after regional operator TUA Abruzzo awarded Daimler Buses Italia and STI (Sviluppo Tecnologico Italiano) a €28.04 million contract on 11 November 2026 for 40 electric low-floor city buses and the charging infrastructure to run them. The order includes an option for eight more vehicles.

With the new vehicles, the electric bus fleet in the Adriatic city will reach 60. About 90 buses run in Pescara’s daily urban scheduled service, excluding reserve vehicles and trolleybuses. An ENB calculation: once delivered, Pescara electric buses will make up about two thirds of that daily fleet, against roughly one fifth today.

What TUA ordered for Pescara electric buses

The tender, issued in September 2025, covered two categories of low-floor urban buses: 18 vehicles with a maximum length of 11 metres and 22 Class I buses with a maximum length of 12.48 metres. The exact Daimler models have not been disclosed.

The contract value of €28.04 million is about €3.92 million below the estimated value of €31.97 million. An ENB calculation: the saving equals about 12.3%, and the contract works out at roughly €701,000 per bus including the depot charging system.

Pescara electric buses chart: 20 electric buses today, 60 after delivery, about 90 buses in daily urban service
Pescara electric buses will make up about two thirds of the city’s daily urban fleet, excluding reserve vehicles and trolleybuses.

Daimler Buses has said it is concentrating fully on battery electric buses, and that its Mercedes eCitaro city bus will move to a dedicated electric platform from 2028. The first Pescara deliveries, due in mid 2027, come before that new platform is available.

Battery capacity and range carried heavy weight in the bid evaluation for the Pescara electric buses. The buses are meant to complete full daily shifts in scheduled service without charging en route, so TUA can replace diesel buses one for one, without adding vehicles to cover charging breaks during the day.

A solar charging depot for Pescara electric buses

The consortium will plan, build and maintain the charging and power supply infrastructure at TUA’s depot on Via Aterno in Pescara. Canopies over 24 parking spaces will carry photovoltaic panels and charging stations. The electrical connection is designed for more capacity than the first 40 buses need, so the fleet can grow without major rework.

The schedule is tight. Execution planning is due within 45 days, followed by technical inspections and about 180 days of construction. The charging facilities are expected to be ready in April or May 2027, and the first buses are due in June or July 2027. An ENB calculation: 24 charging spaces for 40 buses means about 1.7 buses per space that the Pescara electric buses will share at the depot.

Depot charging also adds load to local feeders, a problem studied for EV charging hubs paired with battery storage. Heavier vehicles are moving to batteries too, as with CATL’s dual battery pack for heavy trucks.

EU and national money behind Pescara electric buses

The Pescara electric buses project is funded through fleet renewal and sustainable mobility programmes: the European Regional Development Fund, provided by the Abruzzo region, and Italy’s National Strategic Plan for Sustainable Mobility, administered by the city of Pescara.

“From 2027, we aim to operate urban transport in Pescara without diesel buses, primarily using electric buses and, to a lesser extent, natural gas buses,” said Gabriele De Angelis, president of TUA. The operator publishes service and fleet information on the TUA website.

What to watch

Completion of the Via Aterno depot by May 2027; delivery of the first buses in June or July 2027; whether TUA exercises the option for eight more vehicles; and which Daimler model is supplied, since the new generation of the eCitaro is announced only for 2028.

Add EnergyNews.biz as a preferred source on Google

Share.

The EnergyNews.biz Newsroom covers daily energy transition news: hydrogen, energy storage, small modular reactors, grids, carbon and renewables. News items are researched and edited by the EnergyNews.biz editorial team under the editorial standards of EnergyNews.biz.

Comments are closed.