Close Menu
Energy NewsEnergy News
  • NEWS
    • Breaking News
    • Hydrogen
    • Energy Storage
    • Grid
    • SMR
    • Projects
    • Production
    • Transport
    • Research
  • SPOTLIGHT
    • Interviews
    • Face 2 Face
    • Podcast
    • Webinars
    • Analysis
    • Columnists
    • Reviews
    • Events
  • REGIONAL
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle east
    • Pacific
  • COMMUNITY
  • ABOUT
    • Advisory Board
    • Contact us
    • Report Your News
    • Advertize
    • Subscribe
LinkedIn X (Twitter) YouTube Facebook
Trending
  • Thyssenkrupp Nucera Advances 600-MW Green Hydrogen Project
  • Ineratec Launches Europe’s Largest Green Hydrogen E-Fuels Plant, Era One
  • TotalEnergies Acquires Solar and Battery Storage Pipeline from Low Carbon
  • NuScale’s NRC Approval Sets Stage for America’s Next Generation SMR Power Solutions
  • Yunnan’s Baochi Energy Storage Station Pioneers Grid-Forming Sodium-Ion Battery System
  • Why Physics Dooms the “Green Hydrogen” Fuel Dream
  • NEOM Green Hydrogen Project 80% Completed
  • Green Hydrogen – Pillar of European Industrial Policy but Not Without Challenges
LinkedIn X (Twitter) YouTube Facebook
Energy NewsEnergy News
  • NEWS
    • Breaking News
    • Hydrogen
    • Energy Storage
    • Grid
    • SMR
    • Projects
    • Production
    • Transport
    • Research
  • SPOTLIGHT
    • Interviews
    • Face 2 Face
    • Podcast
    • Webinars
    • Analysis
    • Columnists
    • Reviews
    • Events
  • REGIONAL
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle east
    • Pacific
  • COMMUNITY
  • ABOUT
    • Advisory Board
    • Contact us
    • Report Your News
    • Advertize
    • Subscribe
Energy NewsEnergy News
Home Home - Hydrogen
Green Hydrogen H2 News

Port hydrogen hub proposal in danger

Arnes BiogradlijaBy Arnes Biogradlija27/06/20222 Mins Read
Share
LinkedIn Twitter Facebook Email WhatsApp Telegram

If Viva Energy’s proposed floating gas terminal at the Port of Geelong is built, a $100 MILLION green energy hub would be thwarted.

Geelong Port has secretly submitted a request to Victoria’s Planning Minister for its Geelong Hydrogen Hub on the same location, claiming that the hydrogen hub and the gas storage infrastructure cannot coexist.

Geelong Port’s proposal will establish a production and distribution facility for green hydrogen produced from imported ammonia, thereby assisting the transition of industrial gas users away from the usage of fossil fuels. The port manager has requested that the state government assess preliminary project plans to determine if an Environmental Effects Statement (EES) is required for approval.

An EES is a rigorous evaluation of plans that have the potential to have a substantial impact on the environment, and it is now being used to evaluate Viva’s terminal. Geelong Port referred its plan to Planning Minister Richard Wynne on May 5, as an Inquiry and Advisory Committee for Viva’s EES prepared for public hearings that begin this month. According to its submission, approval of the Viva project would signify the end of its hydrogen effort.

The ultimatum was bolstered by expert testimony from maritime civil engineering consultant Martin Mannion, compiled on behalf of Geelong Port as part of the Viva investigation.

According to Mr. Mannion’s report, the Geelong Port project would have a lesser impact on its surroundings than Viva’s proposal, due to its position further away from land, ammonia being a lower-risk cargo than liquified natural gas, and ammonia-carrying vessels generally being smaller than their LNG counterparts.

Viva Energy has proposed a Geelong Energy Hub for the development and production of alternative energy sources, with prospective projects including a solar energy farm and battery, a hydrogen refueling station, and crude oil storage. However, Viva claims that its gas terminal would be an integral part of its energy center and the first project to be constructed.

Geelong Port’s planned Geelong Hydrogen Hub was initially unveiled late last year in conjunction with worldwide green hydrogen producer CAC-H2.

It has solicited more project partners for the production and utilization of materials and will initiate community and stakeholder engagement this year in preparation of its facilities going online by the end of 2023.

Share. LinkedIn Twitter Facebook Email

Related Posts

Thyssenkrupp

Thyssenkrupp Nucera Advances 600-MW Green Hydrogen Project

04/06/2025
Hydrogen

Ineratec Launches Europe’s Largest Green Hydrogen E-Fuels Plant, Era One

04/06/2025
hydrogen

Yunnan’s Baochi Energy Storage Station Pioneers Grid-Forming Sodium-Ion Battery System

04/06/2025
Hydrogen

Why Physics Dooms the “Green Hydrogen” Fuel Dream

03/06/2025
Green Hydrogen

NEOM Green Hydrogen Project 80% Completed

03/06/2025
Green Hydrogen - Pillar of European Industrial Policy but Not Without Challenges

Green Hydrogen – Pillar of European Industrial Policy but Not Without Challenges

03/06/2025
Thyssenkrupp

Thyssenkrupp Nucera Advances 600-MW Green Hydrogen Project

04/06/2025
Hydrogen

Ineratec Launches Europe’s Largest Green Hydrogen E-Fuels Plant, Era One

04/06/2025
TotalEnergies Acquires Solar and Battery Storage Pipeline from Low Carbon

TotalEnergies Acquires Solar and Battery Storage Pipeline from Low Carbon

04/06/2025
NuScale's NRC Approval Sets Stage for America's Next Generation SMR Power Solutions

NuScale’s NRC Approval Sets Stage for America’s Next Generation SMR Power Solutions

04/06/2025

Subscribe to Updates

Get the latest news from the hydrogen market subscribe to our newsletter.

LinkedIn X (Twitter) Facebook YouTube

News

  • Inteviews
  • Webinars
  • Hydrogen
  • Spotlight
  • Regional

Company

  • Advertising
  • Media Kits
  • Contact Info
  • GDPR Policy

Subscriptions

  • Subscribe
  • Newsletters
  • Sponsored News

Subscribe to Updates

Get the latest news from EnergyNewsBiz about hydrogen.

© 2025 EnergyNews.biz
  • Privacy Policy
  • Terms
  • Accessibility

Type above and press Enter to search. Press Esc to cancel.