Demo
Join Our Newsletter

The Corrib gas field, located off Ireland’s west coast, is managed by Vermilion Exploration and Production Ireland with collaborators Equinor and Nephin Energy. Annually, it meets about 20% of Ireland’s natural gas needs.

Repurposing Potential

Worley, an international engineering consultancy, was tasked with evaluating the best methods to repurpose this field along with the Bellanaboy Gas Terminal infrastructure. The focus is on renewable energy options, including wind, wave, energy storage, hydrogen, and e-fuels.

Key Options and Advantages

According to Nephin Energy’s CEO Tom O’Brien, the consultancy identified several promising options, with significant emphasis on wind energy and hydrogen. The Corrib site is advantageous due to its large industrial area, gas Networks Ireland pipeline access, high wind energy potential, and skilled workforce.

Further Studies and Goals

The companies are proceeding with further studies to evaluate these renewable options’ technical and commercial viability. O’Brien emphasized that repurposing successfully would ensure the continued utility of Corrib’s infrastructure, originally costing over €3 billion, supporting Ireland’s energy transition beyond natural gas.

Vermilion Ireland’s managing director Jarlath Trench highlighted Corrib’s crucial role in Ireland’s energy transition, noting its brownfield footprint, pipeline access, wind energy proximity, and experienced workforce.

Add EnergyNews.biz as a preferred source on Google

Share.

Arnes Biogradlija is the founder and Editor in Chief of EnergyNews.biz, which he launched in 2021 to separate energy transition realities from fairy tales. He writes data driven analysis on hydrogen, energy storage, small modular reactors, grids and industrial policy, and leads the Energy Talks interview series. EnergyNews.biz reporting has been cited more than 100 times by the International Energy Agency.

Comments are closed.