Close Menu
Energy NewsEnergy News
  • NEWS
    • Breaking News
    • Hydrogen
    • Energy Storage
    • Grid
    • SMR
    • Projects
    • Production
    • Transport
    • Research
  • SPOTLIGHT
    • Interviews
    • Face 2 Face
    • Podcast
    • Webinars
    • Analysis
    • Columnists
    • Reviews
    • Events
  • REGIONAL
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle east
    • Pacific
  • COMMUNITY
  • ABOUT
    • Advisory Board
    • Contact us
    • Report Your News
    • Advertize
    • Subscribe
LinkedIn X (Twitter) YouTube Facebook
Trending
  • South Korea’s Largest Hydrogen-Only Fuel Cell Plant Begins Operation in Ulsan
  • Ingeteam Commissions Castilla y León’s First Green Hydrogen Plant
  • Norway’s Karmsund Hydrogen Project to Begin Operations in 2028
  • ITM Power Bets on ‘Hydrogen-as-a-Service’ with New German Subsidiary Hydropulse
  • Greece Weighs Hydrogen Ambitions Against Power Costs and Lack of Subsidies
  • Teesside to Anchor £96M Pipeline Push as Ofgem Backs East Coast Hydrogen Network
  • RIC Energy Secures Site for 220MW Hydrogen-Based E-Fuels Project in Castilla y León
  • ITM Power Gets FEED Contract for Uniper’s Humber H2ub
LinkedIn X (Twitter) YouTube Facebook
Energy NewsEnergy News
  • NEWS
    • Breaking News
    • Hydrogen
    • Energy Storage
    • Grid
    • SMR
    • Projects
    • Production
    • Transport
    • Research
  • SPOTLIGHT
    • Interviews
    • Face 2 Face
    • Podcast
    • Webinars
    • Analysis
    • Columnists
    • Reviews
    • Events
  • REGIONAL
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle east
    • Pacific
  • COMMUNITY
  • ABOUT
    • Advisory Board
    • Contact us
    • Report Your News
    • Advertize
    • Subscribe
Energy NewsEnergy News
Home Home - Europe
Green Hydrogen H2 News

Baden-Württemberg Approves Hydrogen Roadmap

Anela DoksoBy Anela Dokso11/05/20232 Mins Read
Share
LinkedIn Twitter Facebook Email WhatsApp Telegram

The state government of Baden-Württemberg has approved the further development of the Baden-Württemberg hydrogen roadmap, which includes the establishment of the first pipeline connections to the German and European hydrogen network by 2030.

The roadmap, which focuses on infrastructure and future hydrogen needs, aims to secure the country’s hydrogen supply by 2030 at the latest. The approval of the roadmap’s progress report comes after around 500 million euros in funding became effective in the state as a result of hydrogen-related projects.

According to Energy Minister Thekla Walker of the Bündnis 90/Die Grünen party, the first pipeline connections to the German and European hydrogen network in Baden-Württemberg could occur by 2030, with a possible connection as early as 2028 in the Freiburg im Breisgau area. To obtain reliable figures, the ministry has started a new hydrogen requirement analysis. The demand for hydrogen is expected to be significantly higher in 2030 than previously assumed, making reliable figures essential for infrastructure development and conversion.

Baden-Württemberg Prime Minister Winfried Kretschmann, also a member of the Bündnis 90/Die Grünen party, believes that hydrogen is necessary in areas where switching to electrical energy is not possible. Kretschmann stated that “hydrogen is a central building block for the energy transition and climate protection. The supply of green hydrogen and the connection to a national and European hydrogen network are extremely important for phasing out fossil fuels and the competitiveness of our industrialized country.”

Hydrogen is considered a promising energy source due to its potential as a clean fuel that produces only water when burned. The use of hydrogen can help reduce greenhouse gas emissions, which contribute to climate change. Hydrogen can be produced using renewable energy sources such as wind and solar power.

The establishment of the first pipeline connections to the German and European hydrogen network in Baden-Württemberg will help to ensure the country’s supply of hydrogen and support the transition to a more sustainable energy system. However, challenges remain, including the high cost of producing and transporting hydrogen and the need for significant infrastructure investments. The successful implementation of the Baden-Württemberg hydrogen roadmap will require continued government support and collaboration with industry and research institutions.

Share. LinkedIn Twitter Facebook Email

Related Posts

Hydrogen

Ingeteam Commissions Castilla y León’s First Green Hydrogen Plant

25/06/2025
hydrogen

Norway’s Karmsund Hydrogen Project to Begin Operations in 2028

25/06/2025
hydrogen

ITM Power Bets on ‘Hydrogen-as-a-Service’ with New German Subsidiary Hydropulse

25/06/2025
hydrogen

Greece Weighs Hydrogen Ambitions Against Power Costs and Lack of Subsidies

25/06/2025
hydrogen

Teesside to Anchor £96M Pipeline Push as Ofgem Backs East Coast Hydrogen Network

24/06/2025
Hydrogen

RIC Energy Secures Site for 220MW Hydrogen-Based E-Fuels Project in Castilla y León

24/06/2025
Hydrogen

South Korea’s Largest Hydrogen-Only Fuel Cell Plant Begins Operation in Ulsan

25/06/2025
Hydrogen

Ingeteam Commissions Castilla y León’s First Green Hydrogen Plant

25/06/2025
hydrogen

Norway’s Karmsund Hydrogen Project to Begin Operations in 2028

25/06/2025
hydrogen

ITM Power Bets on ‘Hydrogen-as-a-Service’ with New German Subsidiary Hydropulse

25/06/2025

Subscribe to Updates

Get the latest news from the hydrogen market subscribe to our newsletter.

LinkedIn X (Twitter) Facebook YouTube

News

  • Inteviews
  • Webinars
  • Hydrogen
  • Spotlight
  • Regional

Company

  • Advertising
  • Media Kits
  • Contact Info
  • GDPR Policy

Subscriptions

  • Subscribe
  • Newsletters
  • Sponsored News

Subscribe to Updates

Get the latest news from EnergyNewsBiz about hydrogen.

© 2025 EnergyNews.biz
  • Privacy Policy
  • Terms
  • Accessibility

Type above and press Enter to search. Press Esc to cancel.