Close Menu
Energy NewsEnergy News
  • NEWS
    • Breaking News
    • Hydrogen
    • Energy Storage
    • Grid
    • SMR
    • Projects
    • Production
    • Transport
    • Research
  • SPOTLIGHT
    • Interviews
    • Face 2 Face
    • Podcast
    • Webinars
    • Analysis
    • Columnists
    • Reviews
    • Events
  • REGIONAL
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle east
    • Pacific
  • COMMUNITY
  • ABOUT
    • Advisory Board
    • Contact us
    • Report Your News
    • Advertize
    • Subscribe
LinkedIn X (Twitter) YouTube Facebook
Trending
  • US Green Hydrogen Extension Faces Economic Reality: Two-Year Window May Not Bridge Competitiveness Gap
  • India’s Energy Storage Market Breakthrough: Record 8.1 GWh Monthly Tender Volume Drives Tariff Competition to ₹3.13/Unit
  • Hyundai’s New Hydrogen Car Deal: Does It Solve the Real Problems?
  • Green Hydrogen Reality Check: Why 80% of EU Projects Face Cancellation This Decade
  • Future of Geothermal Energy Growth, Technology Breakthroughs
  • Australia’s Green Fertiliser Revolution: Inside the GEGHA Hydrogen & Ammonia Project
  • CATL Scales Battery Swapping Infrastructure with Eyes Set on Europe
  • Mineral Interactions Pose Hidden Risks to Geological Hydrogen Storage Integrity
LinkedIn X (Twitter) YouTube Facebook
Energy NewsEnergy News
  • NEWS
    • Breaking News
    • Hydrogen
    • Energy Storage
    • Grid
    • SMR
    • Projects
    • Production
    • Transport
    • Research
  • SPOTLIGHT
    • Interviews
    • Face 2 Face
    • Podcast
    • Webinars
    • Analysis
    • Columnists
    • Reviews
    • Events
  • REGIONAL
    • Africa
    • Americas
    • Asia
    • Europe
    • Middle east
    • Pacific
  • COMMUNITY
  • ABOUT
    • Advisory Board
    • Contact us
    • Report Your News
    • Advertize
    • Subscribe
Energy NewsEnergy News
Home Home - Europe
Green Hydrogen H2 News

Fugro starts East Anglia Hub site surveys for ScottishPower Renewables

Anela DoksoBy Anela Dokso28/07/20202 Mins Read
Share
LinkedIn Twitter Facebook Email WhatsApp Telegram

Fugro has started the geophysical survey phase of a multidisciplinary site investigation contract worth around GBP 55 million for ScottishPower Renewables’ (SPR) East Anglia Hub project.

The phased site investigations are scheduled to finish at the end of 2021 and support the development of wind farms in the UK southern North Sea over an area of more than 800 km2.

The results from Fugro’s site characterization will feed into SPR’s ground models for the East Anglia Hub and support seabed mobility assessment, foundation design and cable-route engineering.

Operating from dedicated geophysical survey vessels, the Fugro team began the UXO surveys in July; full coverage bathymetric surveys and sub-bottom profiler surveys across the site and export cable routes will follow. Data processing and reporting will be completed in Fugro’s UK and Netherlands offices.

Geotechnical investigation of the wind turbine locations will start later this summer and will comprise ultra-deep seabed cone penetration tests (CPTs) using Fugro’s SEACALF Mk V DeepDrive CPT system, downhole and seismic CPTs, geotechnical sampling, and geophysical borehole logging.

Shallow geotechnical testing and sampling will be performed along the export cable routes, while standard and advanced soil testing will take place at Fugro’s soil laboratory testing facility in Wallingford, UK.

“This is a significant and exciting project for Fugro that will see us deploying multiple geophysical and geotechnical vessels from our fleet to the East Anglia Hub for the next 2 years. Fugro’s innovative technologies, experienced geophysical and geotechnical survey teams, and large capacity for advanced soil testing laboratory in the UK will be crucial in helping SPR to meet their project timescales.”

Richard Hill, Fugro’s proposal manager for the project.

SPR’s East Anglia Hub will consist of 263 wind turbine generators capable of delivering a total installed capacity of up to 3.1 GW, enough to power up to 2.7 million homes.

Share. LinkedIn Twitter Facebook Email

Related Posts

Green Hydrogen

US Green Hydrogen Extension Faces Economic Reality: Two-Year Window May Not Bridge Competitiveness Gap

04/08/2025
energy storage

India’s Energy Storage Market Breakthrough: Record 8.1 GWh Monthly Tender Volume Drives Tariff Competition to ₹3.13/Unit

04/08/2025
Hyundai

Hyundai’s New Hydrogen Car Deal: Does It Solve the Real Problems?

04/08/2025
green hydrogen

Green Hydrogen Reality Check: Why 80% of EU Projects Face Cancellation This Decade

04/08/2025
Geothermal

Future of Geothermal Energy Growth, Technology Breakthroughs

04/08/2025
Hydrogen

Australia’s Green Fertiliser Revolution: Inside the GEGHA Hydrogen & Ammonia Project

01/08/2025
Green Hydrogen

US Green Hydrogen Extension Faces Economic Reality: Two-Year Window May Not Bridge Competitiveness Gap

04/08/2025
energy storage

India’s Energy Storage Market Breakthrough: Record 8.1 GWh Monthly Tender Volume Drives Tariff Competition to ₹3.13/Unit

04/08/2025
Hyundai

Hyundai’s New Hydrogen Car Deal: Does It Solve the Real Problems?

04/08/2025
green hydrogen

Green Hydrogen Reality Check: Why 80% of EU Projects Face Cancellation This Decade

04/08/2025

Subscribe to Updates

Get the latest news from the hydrogen market subscribe to our newsletter.

LinkedIn X (Twitter) Facebook YouTube

News

  • Inteviews
  • Webinars
  • Hydrogen
  • Spotlight
  • Regional

Company

  • Advertising
  • Media Kits
  • Contact Info
  • GDPR Policy

Subscriptions

  • Subscribe
  • Newsletters
  • Sponsored News

Subscribe to Updates

Get the latest news from EnergyNewsBiz about hydrogen.

© 2025 EnergyNews.biz
  • Privacy Policy
  • Terms
  • Accessibility

Type above and press Enter to search. Press Esc to cancel.