Demo
Join Our Newsletter

Therma Marine (TMI) has ordered a barge-mounted 54 MW / 32 MWh energy storage system to be delivered by Wärtsilä on an engineering, procurement, and construction (EPC) basis.

The Wärtsilä barge will be placed next to TMI’s existing thermal power barge of a total of 100 MW in the municipality of Maco in the province of Davao de Oro. The project will be handled on a fast-track basis, with delivery scheduled to be completed in Q4 2021.

This will be the first ever deployment of a floating energy storage solution in the South East Asia region. It will involve placing ten Wärtsilä GridSolv Max systems, supported by the company’s advanced GEMS energy management platform, aboard a floating barge. The solution will provide flexibility for TMI in their ancillary service contract with the National Grid Corporation of the Philippines.

Wärtsilä’s GridSolv Max is an advanced energy storage solution that is designed for streamlined installation and integration, significantly increasing energy density and system reliability to meet customer energy needs while also adequately future-proofing their hardware assets.

Add EnergyNews.biz as a preferred source on Google

Share.

Arnes Biogradlija is the founder and Editor in Chief of EnergyNews.biz, which he launched in 2021 to separate energy transition realities from fairy tales. He writes data driven analysis on hydrogen, energy storage, small modular reactors, grids and industrial policy, and leads the Energy Talks interview series. EnergyNews.biz reporting has been cited more than 100 times by the International Energy Agency.

Comments are closed.