A hydrogen leak in one of the heat exchangers of the Loviisa nuclear power plant’s second unit has led to a reduction in generation capacity, forcing operator Fortum to cut output to 50%.
Renewable South 2025
INTERA Technology Park
Mostar, Bosnia and Herzegovina
Renewable South 2025
INTERA Technology Park
Mostar, Bosnia and Herzegovina